Marble
University of Notre Dame
Loading navigation...

Athens Acropolis: Propylaia: Distant context view of the approach to the Propylaia and temple of Athena Nike, showing the height of the slope

Date

Circa 1910

Location

Architecture Library, Hesburgh Libraries

West end of the Acropolis. Historic view of site, early 20th century. Excavation railway visible and excavation dumps. This was the second building on the Acropolis constructed as part of the Periclean programme. According to building accounts and Plutarch's Pericles (XIII.7), the Propylaia or great gateway (propylon) was begun in 437 BC, and work apparently stopped in 432 BC. The architect was Mnesikles. As constructed, the building consists of a large central hall flanked by wings to the south-west and north-west. Even as built, the Propylaia was never entirely finished: lifting bosses were left on wall blocks and matrices of unworked marble protected the stylobates and steps.

West end of the Acropolis. Historic view of site, early 20th century. Excavation railway visible and excavation dumps.

This was the second building on the Acropolis constructed as part of the Periclean programme. According to building accounts and Plutarch's Pericles (XIII.7), the Propylaia or great gateway (propylon) was begun in 437 BC, and work apparently stopped in 432 BC. The architect was Mnesikles. As constructed, the building consists of a large central hall flanked by wings to the south-west and north-west. Even as built, the Propylaia was never entirely finished: lifting bosses were left on wall blocks and matrices of unworked marble protected the stylobates and steps.
Open external viewer application

Our collection information is a work in progress and may be updated as new research findings emerge. If you have spotted an error, please contact Architecture Library, Hesburgh Libraries at asklib@nd.edu.